Skip to content
AQR

Quality

Inspection points tied to the confirmed specification.

We describe the review workflow neutrally and do not publish unsupported certificates, standards or service promises.

01

Wire and material receipt

Wire coils arrive at the plant and are stored in the factory hall before production.

02

Cold-heading

Wire is fed into cold-heading machines that form the socket blank.

03

Dimensional review

Key dimensions are reviewed against the drawing or size list supplied with the order.

04

Appearance review

Surface and form are reviewed against the agreed specification or sample reference.

05

Packing review

Quantities and labelling are checked against the order before dispatch.